Tatopani Small Hydel Project (2 Mw)
Himal Hydro successfully completed this project as the main Civil Contractor, despite the remoteness of the project from the nearest accessible road and the tunnel being run across the Main Central Thrust (MCT). Nepal Electricity Authority is the owner of the project.
This project is also exemplary in generating construction power from flow through the diversion tunnel.
| Project | Tatopani Small Hydel Project (2 Mw) |
| Location | Myagdi District, Western Nepal |
| Client | Nepal Electricity Authority (NEA) |
| Consultant | CKC, Japan |
| Intake River | Mristi River |
| Dam | Tyrolean Weir 22m x 4m, 550m3 Masonry, 100m3 Concrete |
| Desilting Basin | Underground 28m x 6m x 4.5m |
| Tunnels | Headrace: 760m, 4.5m2; Tailrace 210m; Wet soft clayed ground required substantial rock support including grouting. Surge Shaft - 16m x 9m2 |
| Powerhouse | 20m x 9m x 5m truss type on area excavated 10m below ground level |
| Tailrace | 210m lined canal |
| Air/Electricity | Supplied by a Microhydel constructed in connection with the diversion tunnel. |
| Period of Construction | 1986 - 1991 |
Site Layout