Tatopani Small Hydel Project (2 Mw)

Himal Hydro successfully completed this project as the main Civil Contractor, despite the remoteness of the project from the nearest accessible road and the tunnel being run across the Main Central Thrust (MCT). Nepal Electricity Authority is the owner of the project.

This project is also exemplary in generating construction power from flow through the diversion tunnel.

Project Tatopani Small Hydel Project (2 Mw)
Location Myagdi District, Western Nepal
Client Nepal Electricity Authority (NEA)
Consultant CKC, Japan
Intake River Mristi River
Dam Tyrolean Weir 22m x 4m, 550m3 Masonry, 100m3 Concrete
Desilting Basin Underground 28m x 6m x 4.5m
Tunnels Headrace: 760m, 4.5m2; Tailrace 210m; Wet soft clayed ground required substantial rock support including grouting. Surge Shaft – 16m x 9m2
Powerhouse 20m x 9m x 5m truss type on area excavated 10m below ground level
Tailrace 210m lined canal
Air/Electricity Supplied by a Microhydel constructed in connection with the diversion tunnel.
Period of Construction 1986 – 1991