Tatopani Small Hydel Project (2 Mw)

Project Tatopani Small Hydel Project (2 Mw)
Location Myagdi District, Western Nepal
Client Nepal Electricity Authority (NEA)
Consultant CKC, Japan
Intake River Mristi River
Dam Tyrolean Weir 22m x 4m, 550m3 Masonry, 100m3 Concrete
Desilting Basin Underground 28m x 6m x 4.5m
Tunnels Headrace: 760m, 4.5m2; Tailrace 210m; Wet soft clayed ground required substantial rock support including grouting. Surge Shaft - 16m x 9m2
Powerhouse 20m x 9m x 5m truss type on area excavated 10m below ground level. Tailrace - 210m lined canal.
Air/Electricity Supplied by a Microhydel construction in connection with the diversion tunnel.
Cost of Work US$ 1.3 Million
Period 1986 - 1991

Site Layout

Tatopani - Site Layout