| Project | Mai Hydropower Project (22 MW) |
| Location | Ilam District |
| Owner | Sanima Mai Hydropower (P) Ltd. |
| Scope of Work | Construction of main civil works: Headworks structure which include weir, sediment flushing canal, headrace culvert, headrace tunnel, connecting tunnel between headrace and surge shaft, surge shaft, penstock anchor blocks and saddle support, power house and tailrace canal. |
| Project Period | October 3, 2010 – December 28, 2013 |
Top Third Contractor in Asia for Tunnelling
Himal Hydro is listed as Top Third Contractor in Asia for Tunnelling by Tunnels & Tunnelling International in their Annual Listing 2011. Tunnels & Tunnelling International is the leading news, research, technical information, data and market intelligence resource for the global tunnelling industry.Hydropower Development
- Super Madi Hydroelectric Project (44 MW), Kaski, Nepal
- Middle Modi Hydroelectric Project (15 MW), Kaski, Nepal