Khudi Hydropower Project Civil Repair Works (Damaged by the Flood)

Project Khudi Hydropower Project Civil Repair Works (Damaged by the Flood)
Location Lamjung District, Khudi/Ghana Pokhara VDC
Owner Khudi Hydro Power Ltd.
1st Stage Works
  • Cleaning of the Intake, Gravel Trap, Approach Canal, Settling Basin
  • Strengthening of the foundation of Anchor Blocks and Support Piers damaged by flood
  • Strengthening of foundation of Retaining wall damaged by the flood
  • Opening the buried penstock pipe between anchor blocks and repair damaged section
  • Construction of new Anchor blocks, Support piers and Retaining walls
2nd Stage Works
  • Construction of Retaining wall
  • Reconstruction work of the damaged and new Boulder riprap works in Siphon area
  • Reconstruction of damaged River Training works
  • River Protection Work at required area
  • Demolition work of Bid boulders obstructing the flow in the river at Powerhouse area, Landslide area, different location of anchor block and upstream of intake area
  • Strengthening works at different areas where flood has scoured and attempted to overtop from the area of anchor blocks
Period of Construction From September 26 2008