Khudi Hydropower Project (4 MW)
Khudi Hydropower Project is a run -of- the river small hydropower scheme with gross head of 103 m designed for an installed capacity of 4 MW with two generating unit. Head works consist of boulder lined weir, Intake, Under sluice, approach canal and desettling basin and forebay. Waterway consists of about 2.5 km long penstock pipe from head works to powerhouse.
| Project | Khudi Hydropower Project |
| Location | Lamjung District, Khudi/Ghana Pokhara VDC |
| Owner | Khudi Hydro Power Ltd. |
| Engineer | BPC Hydroconsult (BPCH) |
| Capacity | 4 MW |
| Settling Basin | 2 chamber 70 x 11.6 m x 5.17 |
| Powerhouse | Surface |
| Turbine | Francis 2 x 2 MW |
| Cost of Work | NRs. 164 Million |
| Period | February 2005 - November 2006 |