Bhairabkunda Small Hydroelectric Project (3.0 MW)
| Project | Bhairabkunda Small Hydroelectric Project (3.0 MW) |
| Location | Tatopani VDC, Sindhupalchowk District |
| Owner | Bhairabkunda Hydropower Pvt. Ltd. |
| Scope of Work | Construction of main civil works: Headworks structures which includes Diversion Weir, Side Intake, Bottom intake, Gravel Trap, Settling Basin, Surge Shaft, headrace tunnel; Anchor and thrust blocks for penstock pipes and powerhouse |
| Project Period | February 13, 2009 - December 14, 2010 |